Kure Beach |
Code of Ordinances |
Part II. Code |
Chapter 17. Utilities |
Article VII. Stormwater Service, Rates, Charges And Billing Procedure |
Division 2. Universal Stormwater Management, General Provisions |
§ 17-135. Maintenance
(a) General standards for maintenance.
(1) Function of BMPs as intended. The owner of each structural BMP installed pursuant to this division shall maintain and operate it so as to preserve and continue its function in controlling stormwater quality and quantity at the degree or amount of function for which the structural BMP was designed.
(2) Annual maintenance inspection and report. The person responsible for maintenance of any structural BMP installed pursuant to this division shall submit to the stormwater administrator an inspection report from one (1) of the following persons performing services only in their area of competence: a qualified registered North Carolina professional engineer, surveyor, landscape architect, soil scientist, aquatic biologist, or person certified by the North Carolina Cooperative Extension Service for stormwater treatment practice inspection and maintenance. The inspection report shall contain all of the following:
a. The name and address of the land owner;
b. The recorded book and page number of the lot of each structural BMP;
c. A statement that an inspection was made of all structural BMPs;
d. The date the inspection was made;
e. A statement that all inspected structural BMPs are performing properly and are in compliance with the terms and conditions of the approved maintenance agreement required by this division; and
f. The original signature and seal of the engineer, surveyor, or landscape architect.
All inspection reports shall be on forms supplied by the stormwater administrator. An original inspection report shall be provided to the stormwater administrator beginning one (1) year from the date of as-built certification and each year thereafter on or before the date of the as-built certification.
(b) Operation and maintenance agreement.
(1) In general. Prior to the conveyance or transfer of any lot or building site to be served by a structural BMP pursuant to this division, and prior to issuance of any permit for development or redevelopment requiring a structural BMP pursuant to this division, the applicant or owner of the site must execute an operation and maintenance agreement that shall be binding on all subsequent owners of the site, portions of the site, and lots or parcels served by the structural BMP. Until the transference of all property, sites, or lots served by the structural BMP, the original owner or applicant shall have primary responsibility for carrying out the provisions of the maintenance agreement.
The operation and maintenance agreement shall require the owner or owners to maintain, repair and, if necessary, reconstruct the structural BMP, and shall state the terms, conditions, and schedule of maintenance for the structural BMP. In addition, it shall grant to the town a right of entry in the event that the stormwater administrator has reason to believe it has become necessary to inspect, monitor, maintain, repair, or reconstruct the structural BMP; however, in no case shall the right of entry, of itself, confer an obligation on the town to assume responsibility for the structural BMP.
The operation and maintenance agreement must be approved by the stormwater administrator prior to plan approval, and it shall be referenced on the final plat and shall be recorded with the county register of deeds upon final plat approval. A copy of the recorded maintenance agreement shall be given to the stormwater administrator within fourteen (14) days following its recordation.
(2) Special requirement for homeowners' and other associations. For all structural BMPs required pursuant to this division and that are to be or are owned and maintained by a homeowners' association, property owners' association, or similar entity, the required operation and maintenance agreement shall include all of the following provisions:
a. Acknowledgment that the association shall continuously operate and maintain the stormwater control and management facilities.
b. Establishment of an escrow account, which can be spent solely for sediment removal, structural, biological or vegetative replacement, major repair, or reconstruction of the structural BMPs. If structural BMPs are not performing adequately or as intended or are not properly maintained, the town, in its sole discretion, may remedy the situation, and in such instances the Town of Kure Beach shall be fully reimbursed from the escrow account. Escrowed funds may be spent by the association for sediment removal, structural, biological or vegetative replacement, major repair, and reconstruction of the structural BMPs, provided that the town shall first consent to the expenditure.
c. Both developer contribution and annual sinking funds shall fund the escrow account. Prior to plat recordation or issuance of construction permits, whichever shall first occur, the developer shall pay into the escrow account an amount equal to fifteen (15) percent of the initial construction cost of the structural BMPs. Two-thirds (2/3) of the total amount of sinking fund budget shall be deposited into the escrow account within the first five (5) years and the full amount shall be deposited within ten (10) years following initial construction of the structural BMPs. Funds shall be deposited each year into the escrow account. A portion of the annual assessments of the association shall include an allocation into the escrow account. Any funds drawn down from the escrow account shall be replaced in accordance with the schedule of anticipated work used to create the sinking fund budget.
d. The percent of developer contribution and lengths of time to fund the escrow account may be varied by the town depending on the design and materials of the stormwater control and management facility.
e. Granting to the town a right of entry to inspect, monitor, maintain, repair, and reconstruct structural BMPs.
f. Allowing the town to recover from the association and its members any and all costs the town expends to maintain or repair the structural BMPs or to correct any operational deficiencies. Failure to pay the town all of its expended costs, after forty-five (45) days' written notice, shall constitute a breach of the agreement. In case of a deficiency, the town shall thereafter be entitled to bring an action against the association and its members to pay, or foreclose upon the lien hereby authorized by the agreement against the property, or both. Interest, collection costs, and attorney fees shall be added to the recovery.
g. A statement that this agreement shall not obligate the town to maintain or repair any structural BMPs, and the town shall not be liable to any person for the condition or operation of structural BMPs.
h. A statement that this agreement shall not in any way diminish, limit, or restrict the right of the town to enforce any of its ordinances as authorized by law.
i. A provision indemnifying and holding harmless the town for any costs and injuries arising from or related to the structural BMP, unless the town has agreed in writing to assume the maintenance responsibility for the BMP and has accepted dedication of any and all rights necessary to carry out that maintenance.
(c) Inspection program. Inspections and inspection programs by the town may be conducted or established on any reasonable basis, including but not limited to routine inspections; random inspections; inspections based upon complaints or other notice of possible violations; and joint inspections with other agencies inspecting under environmental or safety laws. Inspections may include, but are not limited to, reviewing maintenance and repair records; sampling discharges, surface water, groundwater, and material or water in BMPs; and evaluating the condition of BMPs.
If the owner or occupant of any property refuses to permit such inspection, the stormwater administrator shall proceed to obtain an administrative search warrant pursuant to G.S. § 15-27.2 or its successor. No person shall obstruct, hamper or interfere with the stormwater administrator while carrying out his or her official duties.
(d) Performance security for installation and maintenance.
(1) May be required. The town may, at its discretion, require the submittal of a performance security or bond with surety, cash escrow, letter of credit or other acceptable legal arrangement prior to issuance of a permit in order to ensure that the structural BMPs are:
a. Installed by the permit holder as required by the approved stormwater management plan, and/or
b. Maintained by the owner as required by the operation and maintenance agreement.
(2) Amount.
a. Installation. The amount of an installation performance security shall be the total estimated construction cost of the BMPs approved under the permit, plus twenty-five (25) percent.
b. Maintenance. The amount of a maintenance performance security shall be the present value of an annuity of perpetual duration based on a reasonable estimate of the annual cost of inspection, operation and maintenance of the BMPs approved under the permit, at a discount rate that reflects the jurisdiction's cost of borrowing minus a reasonable estimate of long-term inflation.
(3) Uses of performance security.
a. Forfeiture provisions. The performance security shall contain forfeiture provisions for failure, after proper notice, to complete work within the time specified, or to initiate or maintain any actions which may be required of the applicant or owner in accordance with this division, approvals issued pursuant to this division, or an operation and maintenance agreement established pursuant to this division.
b. Default. Upon default of the owner to construct, maintain, repair and, if necessary, reconstruct any structural BMP in accordance with the applicable permit or operation and maintenance agreement, the stormwater administrator shall obtain and use all or any portion of the security to make necessary improvements based on an engineering estimate. Such expenditure of funds shall only be made after requesting the owner to comply with the permit or maintenance agreement. In the event of a default triggering the use of installation performance security, the town shall not return any of the unused deposited cash funds or other security, which shall be retained for maintenance.
c. Costs in excess of performance security. If the town takes action upon such failure by the applicant or owner, the town may collect from the applicant or owner the difference between the amount of the reasonable cost of such action and the amount of the security held, in addition to any other penalties or damages due.
d. Refund. Within sixty (60) days of the final approval, the installation performance security shall be refunded to the applicant or terminated, except any amount attributable to the cost (plus twenty-five (25) percent) of landscaping installation and ongoing maintenance associated with the BMPs covered by the security. Any such landscaping shall be inspected one (1) year after installation with replacement for compliance with the approved plans and specifications and, if in compliance, the portion of the financial security attributable to landscaping shall be released.
(e) Notice to owners.
(1) Deed recordation and indications on plat. The applicable operations and maintenance agreement, conservation easement, or dedication and acceptance into public maintenance (whichever is applicable) pertaining to every structural BMP shall be referenced on the final plat and shall be recorded with the county register of deeds upon final plat approval. If no subdivision plat is recorded for the site, then the operations and maintenance agreement, conservation easement, or dedication and acceptance into public maintenance, whichever is applicable shall be recorded with the county register of deeds so as to appear in the chain of title of all subsequent purchasers under generally accepted searching principles.
(2) Signage. Where appropriate in the determination of the stormwater administrator to assure compliance with this division, structural BMPs shall be posted with a conspicuous sign stating who is responsible for required maintenance and annual inspection. The sign shall be maintained so as to remain visible and legible.
(f) Records of installation and maintenance activities. The owner of each structural BMP shall keep records of inspections, maintenance, and repairs for at least five years from the date of creation of the record and shall submit the same upon reasonable request to the stormwater administrator.
(g) Nuisance. The owner of each stormwater BMP, whether structural or nonstructural BMP, shall maintain it so as not to create or result in a nuisance condition.
(h) Maintenance easement. Every structural BMP installed pursuant to this division shall be made accessible for adequate maintenance and repair by a maintenance easement. The easement shall be recorded and its terms shall specify who may make use of the easement and for what purposes.
(Ord. of 7-17-07(2), § 4)