§ 5-158. Condition of building before occupancy is permitted
Latest version.
The placement of the building shall meet all the requirements set forth in the town's zoning ordinance. The building shall
also be in compliance with all building codes related to such building. This shall include, but not be limited to, footing,
tie down rods, framing, flooring, roofing, sheathing, plumbing, and electrical wiring. The exterior of the building (roofing
and siding) shall be uniform and in good condition. The building shall be ready for occupancy within six (6) months from the
time it is placed on the lot, if it is not ready within this time period it shall be condemned.
(Ord. of 7-19-83)
var val = document.getElementById('citecontent').innerHTML;
art.dialog.defaults.title = window.location.href;
art.dialog.data('cite', val);
art.dialog.data('homeDemoPath', '/Scripts/plus/artDialog/');
art.dialog.open('/Scripts/plus/artDialog/citeiframe.html');